National Aquatics Center, the landmark building of Beijing 2008 Olympic Games, is located inside the Beijing Olympic Green. It is axially related to the National Stadium on the north part of Beijing Central Axis and reinforces the historical and cultural features of Beijing city. The planning area of the NSC is 62950m², and the total floor area is 65,000 - 80,000m², in which the underground component is not less than 15,000 m².
National Aquatics Center will be the venue for swimming, diving, synchronized swimming and water-polo final during the Olympic Games. The total seating capacity is 17,000, including 6,000 permanent and 11,000 temporary for Games which will be removed post-Games, then the National Aquatics Center will become the venue for various activities such as aquatic sports, swimming, fitness and recreation.
international competition-winning scheme is known as “Water Cube? It is designed by the design consortium consists of China State Construction Engineering Corporation, China State Construction International (Shenzhen) Design Co., Ltd, PTW Architects (Australia) and Ove Arup (Australia). The design concept of the “water cube?combines the symbolisms of the architecture and the unique water bubble structure, and builds an appropriate complement to the National Stadium. The NSC functionally meets the requirement of 2008 Olympic Games and post-games operation.
National Aquatics Center is owned, managed and operated by BJSAM. Commenced at the end of 2003 and completed at the beginning of 2008. The project was approved by IOC and FINA. |